Opening of a brand-new flagship 535,000 sqm warehouse and fulfillment center for PPE that was on route to the UK. The task was to fit out the entire building ready to be fully functioning in less than 6 months.
Project – From base build to fully working warehouse within 6 months.
AGF Scope of works:
AGF successfully implemented the following design, manufacture/supply, installation, commissioning and documentation management over the tight 6 month deadline:
Mezzanine Floor & Pallet Racking
Fast Pick and VNA Truck Charging Areas
2 no. Comms Rooms
Welfare, Kitchen and Canteen Areas
Offices and Locker Rooms
Passenger Lifts
Warehouse and Office Air Conditioning and Heating Systems
General and Emergency Lighting
Fire Alarm, Gas Suppression and Sprinkler Systems
Data Containment
Data Cabinet Protection Barriers
Bespoke Baffle System
Roof Steel Structures for the Manifolds
Line Marking (both internal & external) with Bollards and Barriers
Armco and Articulated Wheel Stops
Civil Works and Switchgear
Steel Structure for the Generator
Additional Windows and Doors in the External Face of the Base Build
Principal contractor works covering data installation, fuel tanks, intercom system, CCTV, generator, wire guidance, reach trucks
The project was on time and on budget and ready to accept the PPE into the UK.